Case Study

Comprehensive Network Transformation for a Global Industrial Engineering Leader

  • GSI: Leading ISV
  • Delivery Partner: TecTigers
  • Regions Covered: Global

Brief Overview

Leading ISV, with TecTigers as the service delivery partner, delivered a large-scale network transformation project for a leading global industrial engineering company. The engagement involved transforming the network infrastructure across 550+ sites worldwide, impacting over 25,000 devices. Over a three-year period, TecTigers executed site surveys, network design, LAN/WAN refresh, wireless site surveys, decommissioning, and implementation tasks, delivering a future-ready network architecture that aligned with the client’s business objectives.

Fast Facts

Devices Transformed
0 +

SLA Compliance : TBS (To Be Specified)

Sites Covered
0 +
Ongoing Project Duration
0 Y

Key Tasks:

  • Warehousing
  • Preprovisioning/Imaging
  • Decommissioning
  • Migration
  • Disposal
  • Asset Buyback

Client Challenges

  • Global Network Standardization: Transforming network infrastructure across 550+ sites with diverse requirements and existing setups.
  • High Device Volume: Managing over 25,000 devices required a scalable and efficient approach to ensure minimal disruptions.
  • Wireless Network Optimization: Enhancing wireless connectivity through precise site surveys and strategic Access Point (AP) placements.
  • Seamless Transition: Decommissioning outdated equipment while ensuring a smooth transition to the upgraded network.

Solution Delivered by TecTigers

  1. Comprehensive Site Surveys
    • Conducted detailed site surveys and wireless assessments (AP on a Stick) to optimize network design and performance.
  2. Network Design and Implementation
    • Designed and implemented a robust LAN/WAN infrastructure tailored to the client’s operational needs.
  3. Efficient Device Management
    • Managed the decommissioning and packaging of outdated devices, with secure logistics and timely installations.
  4. Scalable Execution Framework
    • Coordinated transformation activities across 550+ sites, ensuring consistency and efficiency.
  5. End-to-End Testing and Optimization
    • Conducted rigorous testing post-installation to ensure the network met performance and reliability benchmarks.

Key Outcomes

  • Future-Ready Network Infrastructure
      Delivered a modernized network capable of supporting the client’s evolving business demands.
  • Global Standardization
      Achieved uniform network performance and reliability across all 550+ sites.
  • Enhanced Wireless Connectivity
      Improved wireless performance through optimized AP placements based on precise surveys.
  • Operational Continuity
      Ensured minimal disruption during the transformation process, maintaining critical business operations.
  • Sustainable Network Lifecycle
      Established a scalable and maintainable network architecture for long-term operational efficiency.